Volume Test Record
No technician set
Home Offline Guide 1 pump line Not validated
A newer version of the VTR form is available.
This form has issues that need attention:

Site & Job Information

If yes, the Proprietor / Manager signature isn't required — that box will show "UNMANNED" instead — and a NoNC is stuck to the dispenser / pump.
SP-J-

Equipment & Inspection Details

Required — no photo yet

Pump & Product Details (up to 10 lines)

Signatures

Not signed
Not signed

Wetstock Adjustment Record (optional second form)

Pulls in the Date, Job No., Oil Co and Site from above, plus each pump line's Location / Grade / Totaliser readings — you'll just need to answer the Wetstock-specific questions below.

Flowmeter Test Sheet (optional form)

Filled from the job: date, client, job no., site and every pump line's readings. A line adjusted and continued into another line shows “Calibration”.

Records on this iPad (kept 30 days unless marked Keep · sent to the office automatically)

No records yet. Every time you Save / Send a PDF, a copy of the PDF and the filled-in form is kept here so it can be reviewed, re-sent or reopened later.
Every saved job is sent to the office as soon as the iPad has signal (Sent); until then it shows Waiting. On this iPad, unkept records are tidied away 30 days after they were last saved; the office copy stays.

Clarkson Electrical Limited — Volume Test Record

VTR Issue 7/25 · quick preview — the saved PDF is the full layout